Proven Expertise

Proven Expertise

  • a) Restoration & Rehabilitation of Plant after having flooded and remaining inundated of GVK’s Alaknanda Hydroelectric Project (4 X 82.50MW; NHPC’s Rangit Hydroelectric Project (3 X 20MW; Lower Modi Hydroelectric Project (2x5MW), Nepal; etc.
  • b) Renovation & Modernisation (R&M) including supply of spares of various large Hydroelectric Projects including Lower Jehlum Hydro Project (3 X 35MW); Devighat Hydro Project (3X5 MW) in Nepal; Rihand Hydroelectric Project (6 X 50MW); Umiam Stg-III Hydroelectric Project (2 X 30MW); etc. etc.
  • c) Operation & Maintenance of Power House (yearly and long term contracts ) of GVK’s Alaknanda HEP (4 X 82.50MW) Hydro Project; NHPC’s Nimoo Bazgo(3x15 MW) Hydro Project; JKPDCL’s Baglihar Hydroelectric Project (3 X 150 MW); NHDC’s Omkareshwar Hydroelectric Project (8X 65 MW); NHPC’s Uri Hydroelectric Project (4 X 60 MW); THDC’s Tehri Hydroelectric Project (4 X 250 MW); GSECL’s Ukai Hydroelectric Project (4 X 75 MW); NHPC’s Salal Hydroelectric Project (6 X 115 MW); NHDC’s Indirasagar Hydroelectric Project (8 X 125MW); etc.
  • d) Special Maintenance / Major repair Works / Capital Maintenance involving supplies, of about 75 hydroelectric generating sets of varying capacities across the country at several projects including Baglihar Hydroelectric Project (3 X 150 MW); Ghatghar Hydroelectric Project (2 X 125 MW); Salal Hydroelectric Project (6 X 115 MW); Tons Hydroelectric Project (3 X 105 MW); Koyna Hydroelectric Project (4 X 80 MW); Ukai Hydroelectric Project (4 X 75 MW); Chibro Hydroelectric Project (4 X 60 MW); Kopili Hydroelectric Project (4 X 50 MW); Lower Jehlum Hydroelectric Project (3 X 35 MW); Upper Sindh Hydroelectric Project (3 X 35 MW); Tanakpur Hydroelectric Project (3 X 31.4 MW); Mahi Hydroelectric Project (2X 25 MW); Dhalipur Hydroelectric Project (3 X 17 MW); Dhakrani Hydroelectric Project (3 X 11 MW); and several more.
  • e) Residual Life Assessment (RLA) studies & testing of projects like Alaknanada Hydro Electric Project (4 X 82.5MW), Sundrijal Hydro Plant (2x500kW), Nepal; etc.
  • f) Supply of various Turbine & Generator spare Parts including Generator Stator Winding Bars & associated insulation materials, Rotor Pole coils, Stator core punching Turbine underwater parts viz Shaft Sealing system, Stainless steel Liner Plates, Runner Labyrinths, Stationary Labyrinths, Guide Vanes, Cooling water system, CGLS system, HS Lubrication systems, Turbine Guide Bearing Pads, Generator Guide Bearing Pads, etc. etc.
  • g) Design, manufacturing, supply, installation, testing & commissioning of Electrical BOP items and Mechanical BOP items like 132/33kV, 20MVA, 3-Phase Transformer; Control & Relay Panels; Diesel Generating Sets; Static Excitation Systems; Governor Control Panels; MIV Control Panels; Trivector Energy Meters; Local Turbine Control Panel (LCU); CTs, PTs; etc.
  • h) Hydro-Mechanical Works for Hydroelectric projects:
    • Design, manufacture, supply, erection, testing and commissioning of Draft Tube Gates and PRV of a 4X 50MW hydro project.
    • Design, manufacture, supply, erection, testing and commissioning of Bulk Head
    • Fabrication & Erection of Steel Shell Liner and Penstock for 60 MW Madhikheda Hydro Project.
    • Fabrication & Erection of Raised Canal Siphon (636 Mtrs. Long Steel Pipeline of 4 Mtr. diameter) for major irrigation work on 16 Piers across river Bansagar Canal.
    • Residual Life Assessment (RLA) studies & testing of 1.3 km Penstock at Sundrijal HEP, Nepal.

ON-GOING HYDRO PROJECTS UNDER EXCUTION:

  • EPC Contract – ADB Funded –Sundrijal Hydro Project in Nepal. involving new supply of all Electro-Mechanical Equipment, Hydro Mechanical equipment and modification in existing Civil Works at Head works and in Power House.
  • EPC Turnkey execution for design, manufacture, supply, installation, testing and commissioning of Upper Kallar Hydro Project involving Complete Civil works (including Tunnel), Hydro Mechanical Woks and complete Electro-Mechanical Works.
  • Turnkey Contract of Erection , Testing & Commissioning of complete Electro-Mechanical Equipment AND Hydro - Mechanical Equipment for Tiga (1x8 MW +1x2 MW) Hydro Project located in Nigeria.
  • Erection, Testing & Commissioning of Punangsanchu Hydroelectric Project (6 X 200MW) in Bhutan.
  • Manufacturing , supply , transportation o Embedded Parts for Sanjan (3x15MW) Hydro Projects of M/s Dongfang Nepal.
  • Manufacturing , supply , transportation o Embedded Parts for Upper Sanjan (3x5MW) Hydro Projects of M/s Dongfang Nepal.
  • Design, Manufacture, Supply, Installation, Testing and Commissioning of Static Excitation System for Chenani Hydro Project of JKPDC.
  • All Operation &Maintenance Contracts under execution (long term and annual basis)
  • Executing the construction of Sewage Treatment Plants (STP) of 20MLD and 8 MLD at Karnal, Haryana.
  • Executing the construction of Sewage Treatment Plant (STP) of 5MLD at Gudivada, Andhra Pradesh.

A few random shots captured at our EPC project sites